Question
Asked by:
$10.00 CheckPoint: Final Project-WBS
- From Computer-Science: General-CS
- Closed, but you can still post tutorials
- Due on Aug. 28, 2009
- Asked on Aug. 28, 2009 at 09:55:09AM
Q:I need a Work Breakdown Structure (WBS) using Microsoft Project. My project is building a database for a Army Motor Pool. I would like to build a better system for the way they distribute keys to their vehicles. I would like to have a database that each vehicles VIN number would be put in. Each vehicle will than be given a stock number and the keys that accompany them will be put in a secure file cabinet in numerical order. When a soldier needs to get a maneuvers, they must log that vehicle out of the database.



