Question
Asked by:
ostella
ostella
Rating : No Rating
Questions Asked: 22
Tutorials Posted: 0
 

$12.00 CheckPoint: Final Project-WBS

  • From Computer-Science: General-CS
  • Closed, but you can still post tutorials
  • Due on Aug. 28, 2009
  • Asked on Aug. 28, 2009 at 11:10:34AM
Q:

I need a Work Breakdown Structure (WBS) in Microsoft Project not PowerPoint. I am basing the project on installing a new database for a Army Motor Pool. I would like to have a database that each vehicles VIN number would be put in.

 


   
   
   
   
 
   
Join Now or Log In
Get Tutoring
Get Paid
Academic Honesty